What are construction crews doing downtown?

This is the first phase of a major revitalization effort in the Historic Downtown.  Over eight thousand feet (8,000’) of water main and three hundred feet (300’) of sanitary sewer main are being installed to replace the aging infrastructure located in our Central Business District.  The goal is to provide better service and fire protection, while at the same time preparing the Downtown for future revitalization.

1.
2.
3.
4.
5.